STEEL GRIT
RECYCLING SYSTEM SPECIFICATION
Every job is
different. Your specifications may vary depending on the project.
BLAST:
·
Run 4 men during 8
hour shifts using #7-#8 nozzles, 1 ton per hour per man.
·
25-30 tons of steel
grit blasted out in one day
VACUUM:
·
Recover the 25-30
tons of grit with a vacuum in 3-4 hours
·
Pull it up vertically
30 feet
CLASSIFY:
·
Classify grit to REMOVE
99.9% of all non-metallic particles (coating dust)
·
Classify grit to KEEP
80-90 mesh steel grit particles
·
Classify grit at a SPEED
of up to 20 tons per hour
CONNECTION:
·
The connection method
will be determined by the components that are required to meet YOUR
SPECIFICATION.
GRIT STORAGE:
·
The system shall hold
______ tons
TRAILER:
·
The trailer shall
have a fifth wheel hitch for use with a tractor.
·
The trailer shall
have a weight capacity of __________ tons.
·
The trailer shall be
able to hold a compressor that weighs ________ tons and is ____ feet long.
·
The maximum trailer
length shall be ______.
·
The number of axles
shall be ________.
How do I
remove the MYSTERY and the RISK?
1. Buy from a
company that understands the need to match a system with your SPECIFIC needs.
Make sure they give you options for the future.
2.
Prepare YOUR
SPECIFICATION by talking with your people. Ask them what they need to get the
job done.
3.
Give YOUR
SPECIFICATION to the manufacturers you are talking with.
4.
REQUIRE them to
certify that the SYSTEM they propose will meet the specification.
5.
REQUIRE them in
writing to buy back the machine if it doesn’t meet the specification
you agree to once it is on the job.
0SAMPLE.DOC